美女露100%双奶头无遮挡,久爱WWW成人网免费视频,亚洲AV无码国产一区二区三区,亚洲爆乳精品无码一区二区三区

  

Shuttling Through the Taihang Mountains, Safeguarding Warmth of Families: A Tribute to the Railway Workers of CR-Zhengzhou on Watang-Rizhao Railway

【字體:

  In the cold of the Taihang Mountains during the twelfth lunar month, heavy freight trains of over ten thousand tons laden with coal on the Watang-Rizhao Railway wind through tunnels and cross valleys, resembling giant steel dragons. During the Spring Festival travel season, many industries experience increased energy demands, and the coal transported via heavy freight trains laden with coal is sent to East and South China, ensuring energy supply for businesses and delivering warmth and light to countless homes.

  The heavy freight trains laden with coal start in Watang Town, Xing County, Lyuliang City, Shanxi Province, and end at Rizhao Port in Shandong Province to the east, spanning 1,260 kilometers. It is China's first self-designed and built heavy-load railway with a 30-ton axle weight, and it is also the world's first 1,000-kilometer-plus heavy-load railway completed in one go. This vital railway serves as a key coal transport route connecting East and West China.

  As the year draws to a close, nearly 1,000 railway workers from CR-Zhengzhou continue to work tirelessly like knights in the Taihang Mountains, safeguarding this crucial lifeline of warmth and energy.

  "Roller coaster drivers": precision control of heavy freight trains.

  "Green light, ready to depart," said Wang Lijun, the driver of the G71503 heavy freight train, as it left Changzinan Railway Station early on January 14. The train, filled with coal, was on its way. During the Spring Festival travel season, more than 140 trains depart daily from this station, with one heavy-load train leaving every 10 minutes during peak times.

  Wang Lijun, 45, is one of the first drivers of the Watang-Rizhao Railway's heavy-load trains. He once drove the first-ever heavy-load train on the line and is a true veteran in the field. The 1,600-meter-long trains he drives are eight times the length of a standard Fuxing EMU train.

  The trains roar down from the Taihang Mountain top to the North Henan plain, descending 1,100 meters in altitude. The route includes 26 slopes, 24 tunnels, 167 curves and 184 bridges, with some sections having a vertical height difference of about 11 stories between the front and rear of the train. Driving these trains is like navigating a roller coaster, and that is why Wang and his colleagues are known as the "roller coaster drivers."

  "Climbing uphill isn't scary, but the most difficult part is going downhill. From Changzinan Railway Station to Tangyindong Railway Station, there are 10 critical braking points. Every time we engage the brake, the error must be within 0.2 millimeters to ensure the safety of the train," Wang said. The 190-kilometer stretch between Changzinan Railway Station and Tangyindong Railway Station is a continuous downhill slope, and the pressure difference for braking must not exceed 1000 Pa. The operating handle's scale is as fine as 0.2 millimeters, which is equivalent to the thickness of a hair.

  A good horse needs a good saddle. Wang Lijun said the key to precise braking is the locomotive he operates. The HXD1 electric locomotive is an advanced eight-axle high-power locomotive in the nation, with a continuous power of 9600 kilowatts, easy to operate, low failure rate and high level of intelligence, making significant contributions to energy transportation.

  "At the front of Taiqianbei Railway Station, the 71503 train arrives complete." After more than five hours of operation, Wang Lijun successfully brought the train to a stop. "When the train is securely stopped and I finish my shift, that's the most rewarding moment for me," he said.

  "Little crab": efficient support for train maintenance.

  On January 13, at the Changzinan Railway station inspection yard, the temperature dropped to -12°C with biting cold winds. Maintenance worker Li Jinyong was using a crowbar to replace the brake pads on a heavy freight train. Due to the frequent braking on the Watang-Rizhao Railway's steep inclines, brake pads wear out quickly. Changzinan Railway Station replaces over 300 brake pads daily.

  Li's job is to inspect trains through methods such as "look, listen, ask, feel" to ensure their condition is optimal. By the end of the day, he bends down or squats more than 2,000 times, walking nearly 20 kilometers.

  After replacing the brake pads, Li Jinyong also checks the braking system to ensure it is working well. In the past, inspections were done manually, which was labor-intensive and inefficient. In harsh weather, the difficulty of repairs increased significantly. However, with the introduction of smart inspection robots, things have improved dramatically.

  Next to Li, a small, square-shaped device resembling a "little crab" swiftly crawls beneath the train. This smart inspection robot, according to Li, equipped with two high-definition cameras, can travel at a speed of up to 30 km/h, automatically collecting high-definition images and sending them to a server. If a fault is detected in the braking system, the robot will notify maintenance workers to perform further checks and repairs.

  "The 'little crab' can inspect in 5 minutes what would take four workers 20 minutes, and it is unaffected by weather, significantly reducing our workload and increasing the vehicle turnover rate by 20%," Li Jinyong explained.

  Many other guardians are working tirelessly on the Watang-Rizhao Railway in the cold winter. For example, Wu Zhiheng, a tail-end worker at the western end of Track 16, has just installed the "iron backpack" on the tail of a train and received a call to head for Track 7. His "iron backpack" consists of three tail-end main machines, each weighing 26 kilograms. During the Spring Festival, temperatures can drop below -20°C at Changzinan Railway Station, but Wu has to remove over 20 tail-end machines every shift, often sweating despite the cold.

  Since the Watang-Rizhao Railway opened on December 30, 2014, it has grown from operating 10 or so trains daily to over 140 trains at full capacity. In 2024, it handled 98.54 million tons of freight, with a cumulative total of 603 million tons of coal and other goods sent.

附件:
回到頂部
   亚洲欧美国产毛片在线| 色综合久久中文字幕无码| 她扒下内裤让我爽了一夜a片| 被窝里的翁憩二十六| 曰韩人妻无码一区二区三区综合部| 另类sm一区二区三区免费视频| 久久香蕉国产线熟妇人妻| 日本护士xxxx做爰| 宝宝好涨水快流出来免费视频| 我半夜摸妺妺的奶c了她| 国产九九九九九九九A片| a片大全| 人狗胶配方大全免费| 亚洲日韩在线中文字幕综合| 国产精品久久毛片| 日本丰满少妇xxxx| 亚洲色大成网站www永久| 99久久国产宗和精品1上映| 久久水蜜桃亚洲av无码精品| 国产av一区二区三区传媒| 亚洲一区二区三区无码久久| 巨物挺破了校花那层薄膜| 川上奈美夫の上司に犯 在线观看| 亚洲精品无码久久久影院相关影片| 最近中文字幕大全免费版在线| 老牛无码人妻精品1国产| 久久国产avjust麻豆| 狠狠躁夜夜躁人人爽天天天天97 | 婷婷综合久久中文字幕| 国产做a爰片毛片a片美国| hd老熟女bbn老淑女| 日产精品99久久久久久| 国产偷窥熟女精品视频| 精品人妻无码一区二区色欲产成人| 亚洲色欲久久久综合网东京热| jk白丝极品被cao到流水呻吟| 久久99精品国产麻豆婷婷| 在线播放亚洲第一字幕| 两个人看的www视频免费完整版 | 妺妺窝人体色WWW看人体| 51福利国产在线观看午夜天堂 |